Many permitting authorities require engineer-stamped drawings for multi-family residential and commercial charging station permits.The Solar Plan Design network includes professional engineers licensed in all 50 states.
Authorities having jurisdiction (AHJs) often require PE-stamped charging station drawings for permits. This adds a complex element to an already tedious permitting process, making it more expensive and time-consuming for contractors. The Solar Plan Design platform was designed to simplify the engineering review and stamping process.